Well we now have the water tower in place, and all the infrastructure pipes for water supply and waste. Also the toilet design is now finalised and building can now progress ahead with the bathrooms. Drainfield and distibution tanks were covered. Several more cottages have been built and some final landscaping has been organised.
-